Description
Borispol. – Possibility of placing a warehouse, distribution center, refrigerator or production. – 2 km to Boryspil Airport – railway line right next to the site – 1 km to the Kiev-Borispol highway. Directly in the city of Boryspil – all buildings were put into operation. – land and buildings in private ownership. Land plot 0.8 hectares owned. Purpose – industrial lands. Asphalt road, minibus stop 50 m from the entrance. Working railway line right next to the site. The plot is fenced with a concrete fence. Well – 70m, septic tank (for the office part), electricity (transformer 620 kW from a neighbor, 100 kW constantly, you can install your own transformer). The project for the installation of a pellet boiler with a capacity of 200 kW, the boiler room is ready. Gas passes along the facade of the site, if necessary, you can connect. Two warehouses and a site for the 3rd block with an area of 2,000 sq.m. The main building is a production and warehouse with built-in office premises, built in 2013 (requires completion of finishing). Area – 1665 sq. M, including office 300 sq. M., 8 m ceilings, self-leveling, anti-dust, anti-spark floors, load 4 tons per sq. M. LED lighting for the warehouse, office and territory. Office – 2 floors, 150 sq. m., repairs requiring completion. Panoramic glazing. Additional building – free-standing warehouse – 220.80 sq.m with a ramp, divided into 3 sections. All buildings were put into operation. Price – 450 thousand US dollars anti-spark, load 4 tons per sq.m. LED lighting for the warehouse, office and territory. Office – 2 floors, 150 sq. m., repairs requiring completion. Panoramic glazing. Additional building – free-standing warehouse – 220.80 sq.m with a ramp, divided into 3 sections. All buildings were put into operation. Price – 450 thousand US dollars anti-spark, load 4 tons per sq.m. LED lighting for the warehouse, office and territory. Office – 2 floors, 150 sq. m., repairs requiring completion. Panoramic glazing. Additional building – free-standing warehouse – 220.80 sq.m with a ramp, divided into 3 sections. All buildings were put into operation. Price – 450 thousand US dollars