Description
Plot – 0.6 m
Equipped with its own transformer substation (KTP TM 250/10)
The composition of the object:
1. Material (B-1)
• total area – 549 sq.m.
• Warehouse 1 (24.4 x 12.4 m) with a loading ramp – the total area of 299 square meters, ceiling height 6.6 m
• Warehouse 2 (20.2 x 12.4 m) – total area of 250 square meters, ceiling height 7.8 m
• Installed equipment:
– the crane beam: load – 3.2 m, span – 12 m
– runway – 21 m
2. Workshops (G-1)
• total area – 547 sq.m. (30 x 18 m)
• room height 8.0 m
• Installed equipment:
– the crane beam: load – 3.2 m, span – 18 m
– runway – 24 m
– ventilation system
3. Administration and amenity building (B-2)
• total area – 418 sq.m. (2 floors 18 x 12.5 m)
• room height 3.3 m
The cost of storage in the sale of $ 200,000