Description
Stop ss-d “Coca-Cola”, 25 km along the highway Kiev – Chernigov Logistic complex / warehouse-office / base / production / TIR-site 77 acres 55 hectare plot (property) – both can be combined! 1.800 m2 production and warehouse building 2018 (property) Ceilings 7m, floors – reinforced screed for max. load, entrance gates – 4 units. (located in a warehouse for up to 12 trucks) 100 m2 Administrative building on the territory (3 offices / workshop / shower / s / y) + 20 m2 checkpoint at the entrance + 1.000 m2 building (property) on a neighboring plot of 55 acres (property) Communications: electr. power 150 kW (380 V), near the transformer substation (the possibility of increasing) The complex – 450 m from the highway Kiev – Chernigov, Asphalt entrance 6 m wide. Neighbors: