Description
Selling a workshop for the processing of granite and natural stone. Highway Zhitomir-Kiev, near Korostyshev, village Strizhivka. Private property, industrial zone, convenient location, 100m from the Zhitomir-Korostyshev highway, 3 km from the railway junction, Korostyshev station. Area 0.5 hectares, all fenced, own transformer substation for 160 kVA, crane MKG-25 (25 tons) -2 pcs, loader 5t 1 pc, cable car for cutting blocks and slabs (opening area 3m * 2m) 3 pcs, automatic multi-saw machine for 6 dust with a diameter of 1600mm 1pc, cutters napivatomat 1600mm 2 pcs, edging machine for 2 heads, dust diameter 800mm-1pc, automatic polishing machine CMR-for slabs (3m * 3m) 1pc, edging machine for tiles and slabs (3m * 3m) -1 pcs, hand-holding polishing machines 4 pcs, multi-saw machine for cutting strip and Burkovka 2 pcs, for 3 and 7 saws with a diameter of 600 mm, metalworking workshop for metal processing – turning machines 4 pcs (dip-600, 1K62, tum-35), milling machines-2 pcs, slotting machine-1, drilling machines-2 pieces, emery, pipe bending machine, welding unit 2 pieces, cutter-1 piece) The area of industrial premises is 1400m2, premises are new, newly built, everything is insulated, heated by solid fuel boilers, utility rooms, shower room, dormitory-4 rooms on 4 people, storage facilities, well-2 pcs. All production facilities are equipped with 7-piece crane girders, there is a large crane girder for the entire warehouse area (not yet assembled). On the territory of a separate room for security. The Internet is connected. All equipment was put into operation at the beginning of 2019. Minibus Gazelle_14 places for transportation of workers. for 3 and 7 saws with a diameter of 600 mm, metal processing workshop – 4 lathes (dip-600, 1K62, tum-35), milling machines-2 pcs, slotting machine-1, drilling machines-2 pcs, emery, pipe bending machine , welding unit 2 pcs, cutter-1 pc) The area of industrial premises is 1400m2, the premises are new, newly built, everything is insulated, heated by solid fuel boilers, utility rooms, a shower, a dormitory-4 rooms for 4 people, storage rooms, a well-2 pcs … All production facilities are equipped with 7-piece crane girders, there is a large crane girder for the entire warehouse area (not yet assembled). On the territory of a separate room for security. The internet is connected. All equipment was put into operation at the beginning of 2019. Minibus Gazel_14 seats – for transporting workers. for 3 and 7 saws with a diameter of 600 mm, metal processing workshop – 4 lathes (dip-600, 1K62, tum-35), milling machines-2 pcs, slotting machine-1, drilling machines-2 pcs, emery, pipe bending machine , welding unit 2 pcs, cutter-1 pc) The area of industrial premises is 1400m2, the premises are new, newly built, everything is insulated, heated by solid fuel boilers, utility rooms, a shower room, a dormitory-4 rooms for 4 people, storage rooms, a well-2 pcs … All production facilities are equipped with 7-piece crane girders, there is a large crane girder for the entire warehouse area (not yet assembled). On the territory of a separate room for security. The internet is connected. All equipment was put into operation at the beginning of 2019. Minibus Gazel_14 seats – for transporting workers. 1K62, tum-35), milling machines-2 pieces, slotting machine-1, drilling machines-2 pieces, emery, pipe bending machine, welding unit 2 pieces, cutter-1 piece) The area of industrial premises is 1400m2, premises are new, newly built, all insulated, heated by solid fuel boilers, utility rooms, shower room, dormitory-4 rooms for 4 people, storage rooms, well-2 pcs. All production facilities are equipped with 7-piece crane girders, there is a large crane girder for the entire warehouse area (not yet assembled). On the territory of a separate room for security. The Internet is connected. All equipment was put into operation at the beginning of 2019. Minibus Gazel_14 seats – for transporting workers. 1K62, tum-35), milling machines-2 pieces, slotting machine-1, drilling machines-2 pieces, emery, pipe bending machine, welding unit 2 pieces, cutter-1 piece) The area of industrial premises is 1400m2, premises are new, newly built, all insulated, heated by solid fuel boilers, utility rooms, shower room, dormitory-4 rooms for 4 people, storage rooms, well-2 pcs. All production facilities are equipped with 7-piece crane girders, there is a large crane girder for the entire warehouse area (not yet assembled). On the territory of a separate room for security. The internet is connected. All equipment was put into operation at the beginning of 2019. Minibus Gazelle_14 places for transportation of workers. premises are new, just built, everything is insulated, heated by solid fuel boilers, utility rooms, shower room, dormitory-4 rooms for 4 people, storage rooms, well-2 pcs. All production facilities are equipped with 7-piece crane girders, there is a large crane girder for the entire warehouse area (not yet assembled). On the territory of a separate room for security. The Internet is connected. All equipment was put into operation at the beginning of 2019. Minibus Gazel_14 seats – for transporting workers. premises are new, just built, everything is insulated, heated by solid fuel boilers, utility rooms, shower room, dormitory-4 rooms for 4 people, storage rooms, well-2 pcs. All production facilities are equipped with 7-piece crane girders, there is a large crane girder for the entire warehouse area (not yet assembled). On the territory of a separate room for security. The internet is connected. All equipment was put into operation at the beginning of 2019. Minibus Gazel_14 seats – for transporting workers. The Internet is connected. All equipment was put into operation at the beginning of 2019. Minibus Gazelle_14 places for transportation of workers. The Internet is connected. All equipment was put into operation at the beginning of 2019. Minibus Gazel_14 seats – for transporting workers.