Description
The property complex near the bypass road, consists of: a warehouse building with an area of 1402.0 sq. m., an office with an area of 21.7 sq. m.,and a hangar-warehouse – an area of 325.1 sq. m. Warehouses with an area of 684, 2 sq. m., and workshops – 257.7 sq. m. There is a technological line for pelletizing wood waste included. Workshop for non-alcoholic drinks and equipment for it.
Floor: 1
Storeys: 1
Year of construction / delivery 1960 – 1979
Infrastructure (up to 500 meters): bank branch, ATM, pharmacy, hospital, clinic, residential area, market, post office.
Landscape (up to 1 km.): forest, mountains.