Description
The building is completely renovated in 2019: topingovy floor; the roof is covered PVC membrane lining sandwich panel (50mm).
Year Built / Completion: After 2015
Electricity can be increased up to 5000 kW
Electricity 2 MW may increase capacity up to 5 MW.
The building is completely renovated in 2019:
– topingovy floor;
– The roof is covered PVC membrane;
– sandwich insulated walls 50 mm;
Infrastructure (500 meters): Town Center
Year Built / Completion: 1960 – 1979
The cost of storage in the sale of $ 4200000