Description
The total area is 1.2 hectares. check-in under a servitude agreement from st. Kozeletska.
Pumping station, 4 unloading units, 5 risers for dispensing oil products.
Access track 350 metro South-Western railway, 4 tanks are installed at the same time on the Oil product discharge.
The reception of light oil products is carried out by railway or road tank cars through the overpass.
The loading-unloading platform is designed for separate unloading or loading of oil products from two tanks (two types of fuel). The number of simultaneously installed tanks – 2 pieces.
The territory of the composition of oil products is fenced and guarded. Fencing around the perimeter of the tank farm.
Power is supplied from a complete transformer substation.