A class “A” logistics complex is under construction.
The first phase of 20,000 m2 includes 15,000 m2 of storage space, a mezzanine and utility rooms / offices up to 5,000 m2. Completion end 2020
The plot of 7.7 hectares allows you to place up to 62,000 m2 of space.
OBJECT SPECIFICATION
– Net height: 12 m
– Column pitch: 24.0 m * 12 m;
– Building frame: reinforced concrete structures
– Fencing structures: wall panels of the “sandwich” type
– Roof: profiled sheet, insulation, membrane
– Floors: anti-dust, floor load 6 t / m2
Dock equipment: 1st stage – 18 docks with automatic dock levelers and sectional doors.
– Warehouses can be equipped with a five – six-tier racking system according to the tenant’s specifications
Network engineering:
• Power supply networks: External power supply source – Kievoblenergo network; The backup source is a diesel generator.
• Heating networks: Boiler house operating on solid fuel (pellets); Heating in the warehouse from PROTON heat generators.
• Systems of water supply, sewerage, storm sewerage
• Telecommunication lines
• Fire safety:
-Fire tank;
-Fire pump station, fire hydrants
– External and internal water supply with fire hydrants
– Sprinkler fire extinguishing system
-Fire alarm;